
| home | design | simulation | construction | my rockets | launch reports | current project | dutch record | links |
Site history, the most recent changes and additions:
| 1 january 2005, | Updated current project redesigned pressure vessel construction principle.(design / current project section) |
| 1 january 2005, | Report external ring pressure test with 3,8 liter / 2 joints vessel went ok on 240 psi. (design / pres. test section) |
| 1 january 2005, | Description of mechanical timer release, made from a old photo camera timer. |
| 30 january 2005, | Mechanical timer, first in flight test and video from the 190 psi launch. (launch section) |
| 30 january 2005, | Added new tab, current project, see progress construction of the 20 liter rocket. |
| 3 february 2005, | Progress on current project updated. |
| 10 february 2005, | Contribution of Sam Mulock the current Dutch record holder, launch video and construction tips, a must see!!. |
| 2 april 2005, | 190 psi launch video of a 6.8 Liter rocket with airspeed triggered topflaps, flight data logging.(launch section) |
| 4 april 2005, | Improved launcher design, autoseal launcher, uses upward pulling force from wrocket for better seal.(construction section) |
| 23 may 2005, | Comparison of flight performance with two types of pressure body reinforcement (construction section) |
To come:
Pressure test with reduced diameter, increased strength, pressure vessels (heat shrunk PET bottles).